Projects completed under

Local Water Utilities Administration (LWUA)

Construction of Urdaneta City Water Supply System

Scope of Works: Construction of 2-well pump station structures complete with related civil and electromechanical works; furnishing of 2- submersible pump sets with an average capacity of 50 lps at 17m TDH, construction of 2 booster pump stations with 6 pump sets with variable speed drives and with an average capacity of 21 lps at 39m TDH, complete with pipes, valves and fittings; furnishing of powerline extension and tapping, construction of 2-100 cu.m. capacity circular concrete ground reservoirs complete with related civil and electromechanical works and supply and installation of approximately 66 km. of transmission and distribution pipelines with sizes ranging from 50mm – 300mm diameter complete with valves, fittings, blow-offs, fire hydrants and related pipe appurtenances.

Project Cost: PHP 108,812,800.20

Date Completed: August 2005 To September 2006