loader

R-II Builders, Inc.

Projects completed under

Department of Public Works and Highways (DPWH)

Pinatubo Hazard Urgent Mitigation Project

Scope of Works: Reconstruction of 9.6km Minalin Tail Dike, the construction of Gugu bridge, construction of evacuation road and channelization of Gugu creek.

Project Cost: PHP 426,298,322.71

Date Completed: October 2000 to September 2003

Package 6B – Improvement of Secondary Roads Project (San Marcelino St./D. Romualdez St./Legarda St./Quezon Blvd.)

Scope of Works: This project consist of road repair works through removal and replacement of damaged PCC Pavement, the provision of a new asphalt concrete overlay, declogging of the existing drainage lines and the rehabilitation of the pedestrian sidewalks.

Project Cost: PHP 49,652,418.78

Date Completed: June 2002 to August 2003

Philippines Export Zone {PEZA) Road connecting Angeles – Magalang Road to East Circumferential Road

Scope of Works: Mobilization/Demobilization, Individual Removal of Trees {small, 501-750mm ¢), Removal of Structures and Obstruction, Unsuitable Excavation {Roadway Excavation), Structure Excavation, Embankment from Borrow, Subgrade Preparation, Aggregate Subbase Course, Portland Cement Concrete Pavement (Unreinforced) 0.30m thk., Reinforcing Steel {Grade 40), Structural Concrete (Class A}, Reflectorized Thermoplastic Pavement Markings White, and Curb and Gutter (Cast in Place).

Project Cost: PHP 13,888,690.00

Date Completed: May 2019 to November 2019

Rehabilitation of Surigao – Davao Coastal Road Manay – Mati

Scope of Works: This project includes improvement and widening of the existing road of about 70.42 kms. closely following the existing alignment, Port Cement Concrete Pavement (PCCP) has 6.70 meter width, subbase shoulder and improvement of drainage structures, provision of road protection works and construction of bridge.

Project Cost: PHP 756,668,473.73

Date Completed: October 2004 – September 2008

Construction of Multi-Purpose Building, Las Piñas City

Scope of Works: Construction of Multi-Purpose Building, Las Piñas City

Project Cost: PHP 144,741,202.60

Date Completed: October 2020 to November 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide – Secondary Roads, Tagudin – Cervantes Road (S00140LZ), Suyo, Ilocos Sur

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Tagudin – Cervantes

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide, – Tertiary Roads, Cervantes – Mankayan – Abatan Road

Scope of Works: Construction of drainage and slope protection structures. Installation of active protection system along Cervantes – Mankayan – Abatan Road

Project Cost: PHP 57,338,819.85

Date Completed: Áugust 2020 to January 2021

Converge and Special Support Program; Construction/Improvement of access roads to leading to trades, SCTEX connecting road

Scope of Works: Demobilization, Individual Removal of Trees, Removal of Structures and Improvement of access roads to leading to trades, SCTEX Obstruction, Unsuitable Excavation, Structure Excavation, Embankment connecting road in support of furniture, 1T-BPM, Hotels, from Borrow, Subgrade Preparation, Aggregate Subbase Course, PCCP Garments and Textile Industries, Angeles City, Pampanga. (Unreinforced) 0.30m thk., Reinforcing Steel (Grade 40). Structural Concrete (Class A). Pipe Culverts, Metal Guard Rail including Post, Metal Beam End Piece, Furnishing and Placing Topsoil, Sodding, Reflectorized Pavement Markings (yellow) and Reflectorized Pavement Marking(white)

Project Cost: PHP 27,841,585.38

Date Completed: May 2019 to January 2020

Rehabilitaiton and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide

Project Cost: PHP 128,098,069.24

Date Completed: May 2021 to May 2022

Rehabilitation and Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Tablas Circumferential Road, Romblon

Scope of Works: Roads: Construction – slope protection using structural measures (revetment, retaining structures, wirenet)

Project Cost: PHP 137,313,210.97

Date Completed: April 2021 to April 2022